Offices Nationwide

Sound Transmissions
Paths can be interrupted by insulation and blocking air paths. A material's insulation is governed by mass, stiffening and damping...more

Environmental Noise Levels
The max exposure time at 85 dBA is 8 hours, at 110 dBA it's just 1 min 29 seconds. If exposed, limit the time and wear hearing protection...more
Part E
Resistance of the Passage of Sound

Our other services include:
Warning: Invalid argument supplied for foreach() in /data04/elite/public_html/Office.php on line 769
New Build Domestic EPCs can also be known as:
New Build On Construction EPC, On Construction EPC, Domestic On Construction EPC, New Build Domestic EPC, New Build EPC, PEA, New Build On Construction Domestic EPC, Predicted Energy Assessment,
Copyright 2025 E2 Specialist Consultants Limited
Company No. 06728970
In County S
On Construction EPCs in Shropshire, On Construction EPCs in Somerset, On Construction EPCs in South Yorkshire, On Construction EPCs in Staffordshire, On Construction EPCs in Stirlingshire, On Construction EPCs in Strathclyde, On Construction EPCs in Suffolk, On Construction EPCs in Surrey, On Construction EPCs in Swansea County,