Offices Nationwide

Reverberation Time
The reverberation time of a room is defined as the time it takes for sound to decay by 60 dB after an abrupt termination...more

Sound Transmissions
Paths can be interrupted by insulation and blocking air paths. A material's insulation is governed by mass, stiffening and damping...more
Part E
Resistance of the Passage of Sound

Our other services include:
Warning: Invalid argument supplied for foreach() in /data04/elite/public_html/Office.php on line 769
Predicted Energy Assessments can also be known as:
On Construction EPC, New Build On Construction Domestic EPC, Domestic On Construction EPC, New Build Domestic EPC, New Build EPC, PEA, New Build On Construction EPC, Predicted Energy Assessment,
Copyright 2025 E2 Specialist Consultants Limited
Company No. 06728970
In County B
On Construction EPC in Banffshire, On Construction EPC in Bedfordshire, On Construction EPC in Berkshire, On Construction EPC in Borders, On Construction EPC in Buckinghamshire,