Offices Nationwide 

Part L1A

Conservation of fuel and power IN NEW DWELLINGS

Guidance for compliance with the Building Regulations for building work to New Dwellings.

To ensure that effective measures for the conservation of fuel and power are incorporated.

Part L1A

Conservation of fuel and power IN NEW DWELLINGS

Guidance for compliance for building work carried out that applies to New Dwellings.

The aim is to recognise the level of sustainability already achieved by the building regulations.

The next step in encouraging the sustainable design and construction of all new buildings.

Part E

Resistance of the Passage of Sound

Why are the new standards in Part E necessary? They are designed to improve modern living.

Part L2B

Conservation of fuel and power

Applies to existing buildings other than dwellings including alterations, conversions and extensions.

Intended to assist the construction industry to comply with the performance standards of Regulations.

Ensure that effective measures for the conservation of fuel and power are incorporated.

Part L2A

Conservation of fuel and power in new buildings other than dwellings.

Approved document for buildings that support the energy efficiency requirements of regulations.

Home energy use is responsible for 28% of UK carbon dioxide emissions contributing to climate change.

The Government’s national calculation methodology for assessing water efficiency in new dwellings.

Part F

Means of Ventilation

It's important to ensure that sufficient ventilation is provided to remove harmful pollutants.

Focuses on sanitation, hot water safety and water efficiency covering England and Wales.

Part L1B

Conservation of fuel and power in Existing Dwellings

Guidance for work to existing dwellings including alterations, conversions and extensions.

Part L2A

Conservation of fuel and power in new builds other than dwellings

Fuel and power in new buildings other than dwellings support the energy efficiency requirements.

This guide has been used to check that non-standard constructions / as builts meet the regulations.

Part L1B

Conservation of fuel and power in Existing Dwellings

For work carried out on existing buildings other than dwellings including alterations and extensions.

Part L2B

Conservation of fuel and power

Guidance for work to existing buildings including alterations, conversions and extensions.

Offering practical advice on how to achieve a reasonable level of air tightness in dwellings.

In recent decades we have enjoyed better standards of cleanliness and more water-using appliances.

It is the law to provide an Energy Performance Certificate for all new and newly built homes.

For the limitation of thermal bridging and air leakage in low and medium domestic types.

The purpose is to limit sound transmissions to a level that will not threaten the health of occupants.

Thermal Bridging And Airtightness

Enhanced Construction Details

Information and guidance relating to thermal bridging for use with Enhanced Construction Details.

Inadequate sound insulation can impair health, allowing noise to disrupt normal life.

Examples and specifications for full refurbishment and works on individual elements.

Improving sustainability of developments whilst helping address the impact of climate change.

 
E2 Specialist Consultants
August 13 at 1:29pm
Today takes 2 of our engineers, air testing this enormous modular classroom in Tring, It took 4 fans to test this space and unfortunately resulted in a Fail. Remedial sealing will be required to areas that we have identified as leaking cold air infiltration. #preperationiskey

E2 Consultants Delivering compliance solutions for Architects & Developers    Head Office E2 HOUSE, South Park Way, Wakefield 41 Business Park, WF2 0XJ    Questions? Call: 0800 043 8100